
Scope:
The works consisted of 3 HDD under-bores with a HDPE sleeve and internal watermain
- 50m of OD560 Sleeve Pipe, 73m of OD355 Water Main.
- 60m of OD450 Sleeve Pipe, 70m of OD315 Water Main.
- 50m of OD315 Sleeve Pipe, 54m of OD180 Water Main.
Additional works included connecting the under-bores to the SEW retic system through a system of valves and by-passes during numerous shut downs and night shifts.
Achievements/Outcomes:
Client was extremely satisfied with the workmanship and effort provided by Jonoco. Minimal issues were found during commissioning.
